Hopp til hovedinnhold
/
/

Start / Dokumenter / Preferred solution, K12 - Appendix L – Design of c...

Åpne PDF (åpnes i ny fane)
77 sider 6.04 MB
Forsiden av dokumentet Preferred solution, K12 - Appendix L – Design of cable stayed bridge and abutments
Studie

Preferred solution, K12 - Appendix L – Design of cable stayed bridge and abutments

The cable stayed bridge is constituting the south portion of the Bjørnafjorden Bridge, "cantilevering" from Reksteren across the Svarvahelleholmen Island and connecting to the floating bridge at axis 3. The tower is positioned on the island, while the 380 m main span allows the navigation to pass under at a height of 45 m and a width of 250 m or more.

Publisert

Eier

Statens vegvesen (SVV)

Utførere

COWI, Norconsult Norge AS, Multiconsult Norge AS, Aker Solutions ASA, Norges geotekniske institutt AS (NGI), Moss Maritime AS, Entail AS og Kolderup-Steen Consult AS

Språk

Norsk (bokmål)