Forsiden av dokumentet Verification of AMC Floating Bridge Concepts BJF 2019

Evaluering

Verification of AMC Floating Bridge Concepts BJF 2019

During fall of 2018 SVV set out two conceptual studies to develop a floating bridge concept for crossing Bjørnafjorden (BJF). DNV GL has been chosen as independent verifier by SVV for this conceptual work. This is reflected in Frame agreement no 15/255967. DNV GL scope of work related to ‘BJF 2019’ is described in Ctrs 610, 615, 620, 625 and 630. For this report reference is made to Ctr 615 with focus on document review and Ctr 620 with focus on independent analyses of AMC chosen bridge concept. This DNV GL report is charged to Ctr 630, reporting to SVV. This report deals with the concepts evaluated by design group AMC. A total of four concepts will be investigated by each of the design groups and one of these considered concepts will be recommended for the next phase (part B, Dec. 2019 – Dec. 2020).