Studie
Preferred solution, K12 - Appendix L – Design of cable stayed bridge and abutments
The cable stayed bridge is constituting the south portion of the Bjørnafjorden Bridge, "cantilevering" from Reksteren across the Svarvahelleholmen Island and connecting to the floating bridge at axis 3. The tower is positioned on the island, while the 380 m main span allows the navigation to pass under at a height of 45 m and a width of 250 m or more.
Publisert
Eier
Statens vegvesen
Utførere
Aas-Jakobsen AS, COWI, Multiconsult Norge AS, Kolderup-Steen Consult AS, Aker Solutions ASA, Entail AS, Norges geotekniske institutt AS, Dissing+Weitling architecture a/s og Moss Maritime AS
Språk
engelsk